Date:
Category:
Category
Case Study
Country:
Country
Australia

PINES RIVER PARK

Image
Pines River Park-case study-img1

At the Pine Rivers Park site there was a concrete pipe which allowed the stormwater overflow to steadily stream down towards holding ponds in Strathpine. Unfortunately, in heavy rain events both sides of the embankment were continually eroded and needed to be addressed before more land was lost.

The river flow levels could reach and exceed five metres per second, therefore the solution chosen were Maccaferri Gabions and Reno Mattresses. A Geofabrics sales engineer provided design advice as well as assisted the installer to prevent any of the gabions and reno-mattresses moving.

The gabions were installed either side of the concrete flume just on the other side of the concrete culvert outlet pipe to prevent any scour of the riverbed. The reno mattresses were installed on both sides of the embankment to prevent any scour of the slopes to ensure water travelled downstream.

SEQ Water were very satisfied with the completion and how neat Christopher Contracting and Caged Rock left the site. Even after heavy rain events, the water flows effectively downstream and with no sign of any scour on the base or slopes.

The gabions and reno-mattresses with on-site assistance ensured the contractor and client had a cost-effective, long-term solution.

 

DOWNLOAD THE CASE STUDY

Pines River Park

 

 

DOWNLOAD