Slope and Ditch Lining

Between the Surat Basin and Curtis Island in Wallumbilla, Queensland, there are a number of compression stations which aid in the transfer of natural gas via huge pipelines. 

While being transported through a gas pipeline, natural gas needs to be constantly pressurised at, which occurs at these stations. These stations are generally remote and unmanned. 

The infrastructure and site required long term, maintenance free solutions that were cost effective with excellent erosion and water management characteristics. 

On this particular site, erosion control was a significant component of the brief, both on the cut slopes and within the drainage channels. To prevent vegetation growth and to handle the erosive forces of a heavy rainfall event, Concrete Canvas was the specified option to line the slopes and drainage channel. 

Due to the remote location of the site and the brief requiring a maintenance free and cost effective solution, traditional alternative solutions such as shotcrete or poured concrete were considered but deemed too expensive.

A local Geofabrics sales engineer attended site to give installation training. The technical team of Concrete Canvas and Geofabrics also helped in anchoring and pegging detailing for the transition between the CC5 on the slopes and the CC8 in the drainage trenches. 

Concrete Canvas was laid transversely after the removal of vegetation on cut batters in drains and adjacent to working platforms. Equipment used was a 20 tonne excavator, dispenser, grinder, collated screw gun and a sledge hammer. Hydration was completed using a watercart via direct spray and soaking methods.

A total of 5,500 m2 of Concrete Canvas was installed on this project taking approximately 0.2 man hours per square metre to install. 

The overall project is still under construction, but the Concrete Canvas component was successful.

Concrete Canvas provided an all-in-one solution which required no additional deliveries of material. This solution saved money during installation and will provide a maintenance free slope and drainage channel for the life of the project.

 