MINE REHABILITATION INTERACTIVE GUIDE

Image
Geofabrics mine rehabilitation 3D banner
x
Image
geofabrics-for-mine-rehabilitation-04-dam-lining-3d

SEPARATING WASTE AND PROTECTING GROUND WATER

Dam lining system separates waste from subgrade soils and protects ground water from contamination. Cushion geotextiles provide economical liner protection.

x
Image
geofabrics-for-mine-rehabilitation-05-retaining-walls-3d-pop

PROVIDING STRENGTH,
STABILITY AND REINFORCEMENT

Geofabrics offers a range of engineered slope and retaining wall solutions used to safely reinforce landforms.

x
Image
geofabrics-for-mine-rehabilitation-09-lining-system-for-leachates-3d-pop-up

EFFECTIVE CONTAINMENT OF LEACHATES IN MINE LANDFILL

The type of waste involved influences the selection of materials for the best geosynthetic lining system.

x
Image
geofabrics-for-mine-rehabilitation-03-erosion-control-3d-pop-up-protect-slopes

PROTECT SLOPES AROUND TAILINGS AND PREVENT EROSION

Geofabrics has a range of surface erosion control solutions that protect the land, reducing sediment loss from high energy impacts, and enable revegetation.

x
Image
geofabrics-for-mine-rehabilitation-06-haul-roads-3d-pop-up-ensure

ENSURE THE BEST PERFORMANCE OF
HAUL ROADS

Minimise construction costs by maximising the use of site won fill and prevent costly maintenance disruptions.

x
Image
geofabrics-for-mine-rehabilitation-07-geoweb-3d-pop-up-providing-erosion

PROVIDING EROSION CONTROL AND REVEGETATING TO SUIT LANDFORM

Geosynthetic erosion measures can be deployed rapidly to prevent loss of surface sediments and organic deterioration of soils.

x
Image
geofabrics-for-mine-rehabilitation-01-geotubes

PROTECT WATER
AND REDUCE WASTE
WITH DEWATERING

Achieve up to 90% reduction in solid waste volume of tailings, allowing for the reuse of water in mine rehabilitation or its safe return to the environment.

x
Image
geofabrics-for-mine-rehabilitation-08-lining-system-3d-pop-up-ensuring-tailings

SAFE, ECONOMICAL AND LONG TERM CAPPING OF TAILINGS

Enables capping of soft tailings which can then be backfilled, and construct the final landform with grades from 100kN/m to 2,000kN/m.

BOOK A CONSULTATION
I am interested in R&D Laboratory Testing (select all that apply):
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
Image CAPTCHA
Enter the characters shown in the image.