It was expected that mobile cranes with axle loads up to 12 tonne would be trafficking this road due to the construction of a new treatment plant nearby.
Geofabrics was approached by the asset owner to provide a solution that would limit loading these pipes would be exposed to. It was critical to ensure that the loading on the pipes would not exceed the limit deemed safe by the designers.